Data Center / Campus / Core / Aggregation / ToR / EoR

Aruba CX 8325: do you need 48 ports of 25G, or 32 ports of 100G?

1U fixed-port AOS-CX switch — up to 6.4 Tbps, 25/100GbE line rate, VSX HA, and one platform for campus core or data-center ToR/EoR.

Quick Take

Quick Take: Two port layouts carry this decision: 48Y8C gives 48 ports at 25G plus eight 100G uplinks, while 32C gives 32 ports at 100G. Both are 1U, both run AOS-CX near 6.4 Tbps, and both expect VSX pairs. Airflow direction, optics, and license tier are ordered separately, so specify them early.

Model Ladder

Quick Answer: Four variants make up the ladder: the 8325-48Y8C pairs 48 SFP28 access ports with eight 100G uplinks for 25G server rows, the 8325-32C brings 32 QSFP28 ports for spine duty, the 8325P targets provider and 5G edge builds, and the half-width 8325H fits shared 1U colo slots. The first two share a ~6.4 Tbps ASIC.

Specs summarize HPE Aruba Networking CX 8325 QuickSpecs and datasheets. Confirm SKU bundles (fans/PSU/airflow), optics, and AOS-CX license features on the quote. BENQUAN GLOBAL LIMITED is an HPE Partner and supplies Aruba CX switches and optics. Related: CX 6300, Nexus 9300, Arista 7050X3/7280R3, Extreme 5520/5720, SKU Lookup. Request a quote.

Model class Ports Switching capacity* Notes
CX 8325-48Y8C 48×1/10/25GbE SFP28 + 8×40/100GbE QSFP28 ~6.4 Tbps / ~2000 Mpps Dense 25G ToR or campus aggregation
CX 8325-32C 32×40/100GbE QSFP28 ~6.4 Tbps / ~2000 Mpps 100G spine/agg; 4×10/4×25 breakout options
CX 8325P 32C-class porting ~6.4 Tbps class Provider / 5G RAN & edge compute oriented
CX 8325H 18×1/10/25G + 4×40/100G or 16×40/100G ~2.16 / ~4 Tbps ASIC class Half-width 1U for edge/colo racks

*Published HPE/Aruba figures; confirm exact SKU on QuickSpecs.

1U
Form factor
6.4T
Bidirectional*
100G
Uplink class
VSX
HA model

Breakout: QSFP28 ports support optional 4×10G and 4×25G breakouts (model/OS limits apply — e.g., 8325P documents higher breakout port counts). Order correct optics/DAC and plan lane mapping before cabling.

Overview

Quick Answer: A 1U AOS-CX switch that sits between access stacks and modular cores, carrying campus aggregation or data center top-of-rack duty on the same platform. Line-rate 25G and 100G ports let a 10G or 40G fabric move up a generation without buying a chassis, and airflow direction is a SKU choice.

CX 8325 bridges the gap between access stacks (e.g., CX 6300) and larger modular cores. Wire-speed 1/10/25/40/100GbE helps migrate from 10G/40G fabrics to 25G/100G without a chassis forklift. Redundant hot-swappable PSUs and fans ship in common bundles; front-to-back and back-to-front airflow SKUs support both campus and hot/cold-aisle DC layouts.

AOS-CX & HA

Quick Answer: AOS-CX runs as a microservices operating system with REST and Python hooks built in, plus an analytics engine for troubleshooting. High availability comes from VSX dual-chassis pairs that forward on both members and upgrade without dropping traffic, so budget these switches two at a time rather than as single units.

  • Automation: built-in REST APIs and Python; NAE for analytics-driven troubleshooting.
  • Routing: advanced L2/L3 including BGP, OSPF, VRF-Lite, IPv6 (feature set per software train).
  • Overlay: dynamic VXLAN for campus/DC fabric designs.
  • VSX: industry-leading dual-chassis HA for hitless upgrades and dual-active forwarding — size pairs as a unit.
  • Typical hardware: ~16 GB RAM / 64 GB SSD on standard 8325; higher memory/SSD on 8325P/H classes per QuickSpecs.

Use Cases

Quick Answer: Campus core above CX 6300 access, 25G ToR for PowerEdge/UCS racks, and 100G aggregation with VSX. 8325-48Y8C facing PowerEdge R760 / UCS NICs at 25G, with 100G uplinks to spine. VSX pair of 32C or 48Y8C above access stacks such as CX 6300 or multi-gig Extreme/Catalyst closets.

Data-center ToR for 25G servers

8325-48Y8C facing PowerEdge R760 / UCS NICs at 25G, with 100G uplinks to spine.

Campus core / aggregation

VSX pair of 32C or 48Y8C above access stacks such as CX 6300 or multi-gig Extreme/Catalyst closets.

Vs Nexus 9300 / Arista 7050X3

Multi-vendor leaf RFQs: Nexus 9300, Arista 7050X3/7280R3.

Edge / colo density

8325H half-width when two switches share one RU in constrained racks.

Buying Checklist

Quick Answer: Start with port model, then airflow bundle, then the VSX interconnect and its optics. After that, price 25G and 100G transceivers, breakout cables, the license tier your EVPN design actually needs, management, and spares. Power draw varies by hundreds of watts between idle and full load, so confirm it early.

  1. 48Y8C vs 32C vs 8325P vs 8325H
  2. Front-to-back vs back-to-front fan/PSU bundles
  3. VSX interconnect and ISL optics
  4. 25G/100G optics, DACs, and breakout cables
  5. VXLAN / BGP EVPN design needs vs license tier
  6. Centralized management (Central / Fabric Composer as applicable)
  7. Spare PSUs, fans, and optics for critical pairs
  8. Power draw (idle vs max — model-dependent, often hundreds of watts at full load)

Search Aruba / networking parts on SKU Lookup.

Frequently Asked Questions

Quick Answer: Three questions come up: whether this switch stacks like the access-layer 6300, how it compares with the 8360 and 8400 families, and how to source it. The answer to the first is no: deploy VSX pairs or standalone units, because the cabling and operating model differ entirely.

The official CX 8325 sheet is on HPE: a00059009enw (hpe.com). This page is the RFQ ladder — 25G/40G/100G SKUs and VSX pairs — so you size a leaf or mid-spine before opening that sheet. Confirm AOS-CX train on the quote.

No — plan VSX pairs (or standalone) rather than VSF stacking. Operational model and cabling differ from access-layer CX 6300 stacks.

8325 is the fixed 1U 25/100G workhorse. Higher CX modular or different fixed families (e.g., 8360/8400-class) address other density or chassis needs — match the exact series to port and buffer requirements on the RFQ.

Contact info@benquan.hk or request a quote.

Key Takeaway

Key Takeaway: Pick 48Y8C when the rack is full of 25G server NICs; pick 32C when the switch feeds spines or other 100G aggregation. Order in pairs for VSX, match airflow to the aisle, and budget optics and breakout cables as their own line. BENQUAN GLOBAL LIMITED is an HPE Partner and supplies the Aruba CX 8325 with competitive pricing.

Not sure your BOM is optimal?

If you are unsure whether your BOM is optimal, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents