Networking / AI / HPC Fabric / Modular Spine

Does the 7800R4 scale to 460 Tbps and 576 ports of 800GbE?

Modular AI spine on Jericho3+ — up to 460 Tbps (920 Tbps full-duplex), 576x 800GbE or 1152x 400GbE across 4/8/12/16-slot chassis, 36x 800G OSFP line cards with 32 GB VOQ deep buffer for lossless GPU-cluster fabrics.

Quick Take

Quick Take: The Arista 7800R4 is a modular AI spine on the Jericho3+ ASIC, scaling to 460 Tbps and 576x 800GbE or 1152x 400GbE. Its fully scheduled VOQ fabric with 32 GB deep buffer per card is built for lossless GPU-cluster interconnect..

Key extractable numbers

Arista 7800R4 class numbers on this page: modular AI spine on Jericho3+; fully populated 16-slot system about 460 Tbps (920 Tbps bidirectional) with up to 576× 800GbE or 1152× 400GbE. Per line card: ~28.8 Tbps / 10.8 Bpps forward, 32 GB VOQ buffer. Fully scheduled VOQ fabric is the lossless GPU-cluster interconnect story—confirm slot fill and optics on the dated RFQ.

Performance

Quick Answer: A fully populated 16-slot system moves 460 Tbps — 920 Tbps counting both directions — across as many as 576 ports of 800G, or double that count at 400G. Per card, the Jericho3+ silicon forwards 28.8 Tbps at 10.8 Bpps, keeps 32 GB of VOQ buffering, and holds latency near 3.8 microseconds.

Figures follow the official Arista 7800R4 Series datasheet. Confirm the EOS train, chassis, line-card mix, and optics on the quote. BENQUAN GLOBAL LIMITED supplies Arista switching and optics. Related: Arista 7050SX3/7280SR3, Spectrum-X fabric BOM, SKU Lookup. Request a quote.

Metric Arista 7800R4
System throughputup to 460 Tbps (920 Tbps full-duplex)
Max 800GbE density576 ports
Max 400GbE density1152 ports
ASICJericho3+ (deep buffer, VOQ)
Line card (36PE)36x 800G OSFP (or 72x 400G)
Line-card throughput28.8 Tbps (57.6 Tbps full-duplex)
Line-card forwarding10.8 Bpps
Packet buffer per card32 GB (VOQ)
Line-card latencyfrom ~3.8 µs

*Arista 7800R4 Series datasheets. Density figures reflect the 16-slot chassis fully populated. Confirm against your EOS release.

460T
System throughput
576
800GbE ports
36×800G
Per line card
32GB
VOQ buffer / card

Overview

Quick Answer: The 7800R4 is Arista's flagship modular spine for AI, cloud, and service-provider cores. Built on the Jericho3+ ASIC, it keeps the deep-buffer, non-blocking, fully scheduled VOQ architecture of the 7800R3 and 7500 lines while adding 800GbE. Use it as a single-tier interconnect or the spine of a two-tier GPU-cluster fabric.

The 7800R4 extends the 7800 platform to 800GbE with the same cell-based, internally lossless architecture — virtual output queues, distributed credit scheduling, and deep buffering — purpose-built for accelerated-computing clusters and next-generation data-center and service-provider cores. Line cards are hot-insertable, so you add radix to a populated chassis without a forklift change, and the HyperPort capability can bond four 800G ports into a single 3.2 Tbps logical port to cut AI job completion time.

Sizing rule: Size the spine on radix and buffer, not just headline capacity — GPU fabrics need the 32 GB VOQ deep buffer and lossless scheduling to survive incast, so match line-card count and 800G/400G breakout to your GPU rail design.

7800R4 Front Panel, Ports & Chassis

Quick Answer: The 7800R4 comes in four chassis — 7804R (4-slot, 10RU), 7808R (8-slot, 16RU), 7812R (12-slot, 23RU), and 7816LR (16-slot, 32RU). All share Jericho3+ line cards and support HVAC, HVDC, and LVDC power. The 36-port 800G OSFP card supports 100G/200G/400G breakout, so a chassis mixes speeds without changing tiers.

Chassis Line-card slots Rack units
7804R410 RU
7808R816 RU
7812R1223 RU
7816LR1632 RU
  • Line card 7800R4-36PE: 36x 800G OSFP (or 72x 400G), 28.8 Tbps, 10.8 Bpps, 32 GB buffer.
  • OSFP and QSFP-DD connectors; 100G/200G/400G breakout for backward and forward compatibility.
  • Architectural consistency with the 7800R3 and 7280R3 protects existing designs and EOS operations.

Use Cases

Quick Answer: The 7800R4 anchors AI/ML and HPC GPU-cluster spines, data-center interconnect and WAN edge, and service-provider core and peering. Deep buffers and VOQ scheduling absorb incast and speed mismatches without drops; FlexRoute handles full internet tables. It works as a single-tier interconnect or the spine layer of a two-tier cluster.

AI / GPU cluster spine

Lossless, fully scheduled forwarding for GPU rail spines where incast and elephant flows overwhelm shallow-buffer switches.

Data-center interconnect / WAN edge

32 GB deep buffers absorb speed mismatches and long-haul burst patterns without packet drops.

Service-provider core & peering

FlexRoute and the VOQ fabric handle full-table environments at chassis scale for peering and transit.

Vs 7280R3 leaf and Spectrum-X

Pair with 7280SR3 leaf; compare fabric approaches with NVIDIA Spectrum-X.

Buying Checklist

Quick Answer: Size the chassis (4/8/12/16-slot) to spine radix and growth, then set the 800G/400G line-card count and breakout to your GPU rail design. Confirm optics (OSFP/QSFP-DD), power option (HVAC/HVDC/LVDC), EOS licensing, and whether HyperPort helps. Plan cabling and cooling for the deep-buffer line cards before freezing the BOM.

  1. Chassis size (7804R / 7808R / 7812R / 7816LR) for spine radix and growth
  2. 800G / 400G line-card count and breakout to match GPU rails
  3. Single-tier vs two-tier spine design
  4. Optics: 800G OSFP / 400G QSFP-DD and breakout cables
  5. Power option: HVAC, HVDC, or LVDC
  6. HyperPort bonding for AI job completion time
  7. EOS train and feature licensing
  8. Cooling and cabling for deep-buffer line cards

Search Arista SKUs on SKU Lookup. For leaf-spine optics planning, see leaf-spine optics BOM.

Frequently Asked Questions

Quick Answer: Common questions cover the 7800R4's throughput and port density, chassis options, GPU-cluster suitability, and where to source it. Size on radix and deep buffer for AI fabrics; confirm chassis, line cards, optics, and EOS on the quote. BENQUAN supplies the 7800R4.

The official 7800R4 chassis PDF is on Arista: 7800R4-Series-Data-Center-Switch-Router.pdf. This page is the RFQ table — line-card density and VOQ buffer — so you size a modular spine before opening that PDF. Confirm supervisor and fabric modules on the quote.

The 7800R4 scales to 460 Tbps of system throughput (920 Tbps full-duplex), with up to 576 ports of 800GbE or 1,152 ports of 400GbE in the 16-slot 7816LR. Each 36-port 800G line card delivers 28.8 Tbps of forwarding, 10.8 billion packets per second, and 32 GB of VOQ packet buffer.

The 7800R4 comes in four chassis: the 7804R (4-slot, 10RU), 7808R (8-slot, 16RU), 7812R (12-slot, 23RU), and 7816LR (16-slot, 32RU). All support HVAC, HVDC, and LVDC power and share the same Jericho3+ line cards, so you scale radix by adding cards without a forklift change.

Yes. Its fully scheduled, cell-based VOQ architecture with 32 GB of deep buffer per line card delivers lossless, fair forwarding that absorbs incast and elephant flows common in GPU clusters. It serves as a single-tier interconnect or the spine of a two-tier cluster, with 800G and 400G breakout for flexible fabric design.

Contact info@benquan.hk or request a quote for a free BOM compatibility and delivery-risk review.

Key Takeaway

Key Takeaway: The Arista 7800R4 is a Jericho3+ modular AI spine scaling to 460 Tbps and 576x 800GbE, with a 32 GB deep-buffer VOQ fabric built for lossless GPU-cluster interconnect. Size on radix and buffer, match 800G/400G breakout to your rails, and pick the chassis for growth. BENQUAN supplies 7800R4 chassis, line cards, and optics with competitive pricing.

Not sure your BOM is optimal?

If you are unsure whether your 7800R4 spine and line-card BOM are optimal, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents