Data Center Interconnect / Routing / 800G Switching / Specs / Ordering

Is the 7280R4K-32DE 32 ports of 800GbE with deep buffers?

The 7280R4 32x800G QSFP-DD switch router for encrypted DCI, peering, and spine-border roles — routing scale under LIC-FIX-5-FLX, QDD-800G optics pairing, and quote-ready ordering information.

Quick Take

Quick Take: DCS-7280R4K-32DE-F is the Arista 7280R4 fixed switch router: 32x 800GbE QSFP-DD, deep buffers, large route tables, and enhanced encryption for DCI and backbone roles. LIC-FIX-5-FLX unlocks 3.5M routes with traffic engineering. QDD-800G optics complete the line-up Reference official datasheets for detailed specifications.

Key extractable numbers

DCS-7280R4K-32DE-F on this page: 32× 800GbE QSFP-DD fixed switch-router for DCI/backbone, deep buffers, front-to-rear airflow, dual AC, Arista EOS. LIC-FIX-5-FLX unlocks about 3.5M routes with traffic engineering; complete the line with QDD-800G optics. Confirm airflow letter and license tier on the dated quote.

Technical Specifications

Quick Answer: Headline numbers: 32x 800GbE QSFP-DD in a fixed chassis, deep packet buffers for congested WAN and DCI links, front-to-rear airflow, dual AC supplies, Arista EOS throughout. Routing scale is license-driven: LIC-FIX-5-FLX raises the ceiling to 3.5M routes with advanced MPLS, traffic engineering, and protection.

The most expensive mistake on 7280R4 BOMs is not the chassis — it is quoting the router without its license tier and 800G optics on the same calendar. A box that lands a quarter before its LIC-FIX-5-FLX license or its CS-connector patch cords is rack decoration.
32x
800G QSFP-DD Ports
3.5M
Routes (FLX License)
Deep
Packet Buffers
2 km
QDD-800G Reach
Specification DCS-7280R4K-32DE-F
SeriesArista 7280R4 (fixed deep-buffer switch router)
Ports32x 800GbE QSFP-DD
BufferingDeep packet buffers (VOQ switch-router silicon)
Build designatorsK/DE — large route tables with enhanced encryption
Routing scaleUp to 3.5M routes and 24K+ ACLs with LIC-FIX-5-FLX
Protocol stackEVPN, VXLAN, Segment Routing, advanced MPLS LER/LSR, TE + link/node protection (licensed)
AirflowFront-to-rear (-F suffix)
Power2x hot-swap AC supplies (DC options orderable)
Operating systemArista EOS (single image across the estate)
Quote-verified opticsQDD-800G-2FR4, QDD-800G-2XDR4, QDD-400G-FR4, QSFP-100G-FR

Fixed router, chassis-grade tables

The pitch of the R4K build is holding full internet tables and encrypted DCI in 1-2 rack units instead of a modular chassis. Exact buffer sizes and encryption throughput vary by EOS release and configuration — pin them in the RFQ rather than quoting datasheet ceilings into a design document.

Product Overview: Where the 7280R4K Sits

Quick Answer: The 7280R family is Arista's deep-buffer switch-router line, and the R4 generation moves it to 800G. The 32DE build pairs 32 ports of 800G QSFP-DD with the large-route-table, enhanced-encryption feature set, so one fixed box can hold internet-scale tables while encrypting data-center interconnect links.

Two Arista silicon philosophies coexist in every large estate: shallow-buffer fabric switches (7050/7060 series) for server-facing leaf-spine, and deep-buffer switch routers (7280/7800 series) where WAN congestion, full tables, and encryption live. The 7280R4K-32DE is the fixed-form 800G expression of the second philosophy — its modular sibling is covered in Arista 7800R4 specs & use cases.

LIC-FIX-5-FLX: What the Full FLX Tier Buys

Quick Answer: LIC-FIX-5-FLX is the full FLX tier for Fixed Group 5: routing to 3.5M routes, more than 24K ACL entries, EVPN, VXLAN, Segment Routing, advanced MPLS LER and LSR, plus traffic engineering with link and node protection. FLX-Lite tiers on leaf-spine fabrics deliberately omit those last features.

Capability LIC-FIX-5-FLX (this router) FLX-Lite (e.g. LIC-FIX-4-FLX-L on fabric switches)
Route scaleUp to 3.5M routesUp to 256K routes
ACL scaleMore than 24K entriesStandard fabric scale
EVPN / VXLAN / SRIncludedIncluded
MPLS roleAdvanced LER + LSRBase LSR only
Traffic engineeringIncluded, with link/node protectionNot included

The rule of thumb: fabric switches take FLX-Lite because leaf-spine designs never touch TE; border and DCI routers take full FLX because they do. One license per chassis, quoted with the hardware.

800G Optics Pairing: 2FR4 vs 2XDR4

Quick Answer: Each 800G QSFP-DD port runs QDD-800G-2FR4 as two independent 400G-FR4 channels over duplex single-mode with dual CS connectors, or QDD-800G-2XDR4 as parallel single-mode on dual MPO-12. Step-down and breakout links reuse QDD-400G-FR4 and QSFP-100G-FR inside the same 2-kilometer single-mode reach class.

Optic Payload Fiber / connector Reach
QDD-800G-2FR42x 400GBASE-FR4Dual duplex SMF, dual CS connectors2 km
QDD-800G-2XDR42x 400GBASE-XDR4Parallel SMF, dual MPO-122 km
QDD-400G-FR4400GBASE-FR4Duplex SMF, LC2 km
QSFP-100G-FR100GBASE-FRDuplex SMF, LC2 km

The 2FR4/2XDR4 fork is a fiber-plant decision, not a performance one: duplex-with-CS versus parallel-with-MPO. CS patch cords are the item most sites do not stock — flag them on the cabling scope. The complete 100G-to-800G single-mode ladder, including DR-class 500 m optics and breakout interop, lives in the Arista SMF optics guide.

Use Cases: Where the Deep-Buffer 800G Box Earns Its Price

Quick Answer: Three roles fit the box: encrypted data-center interconnect where deep buffers absorb WAN congestion, internet-edge and peering routers holding full tables under LIC-FIX-5-FLX, and 800G super-spine or fabric-border duty above 400G leaf-spine pods. Keep pure leaf-spine fabrics on 7060X5-class hardware instead.

1. Encrypted DCI between sites

Deep buffers ride out speed mismatch and congestion on long-haul links while the enhanced-encryption build protects traffic in flight — the classic reason the 7280R line exists. 2 km optics cover campus and metro handoff points; beyond that, coherent/DWDM lines are a separate RFQ.

2. Peering and internet edge

LIC-FIX-5-FLX route scale (3.5M) holds full tables with headroom, and 24K+ ACLs absorb peering policy. EVPN/VXLAN plus advanced MPLS lets one platform bridge the data-center overlay into the WAN underlay.

3. 800G super-spine / fabric border

Above 400G leaf-spine pods (sized in the 7060X5 HGX fabric BOM), the 32x800G box aggregates pods or borders the AI fabric to the campus core — each 800G port feeding two 400G spine links via 2FR4/2XDR4 splits.

Ordering Information (Part Numbers Only)

Quick Answer: Four lines complete the order: DCS-7280R4K-32DE-F chassis, one LIC-FIX-5-FLX per unit, QDD-800G optics matched to your fiber plant, and A-Care support on one term. Confirm the airflow suffix, AC versus DC feeds, and connector types before any purchase order goes out.

Order line Part number Notes
ChassisDCS-7280R4K-32DE-F32x 800G QSFP-DD, large routes + enhanced encryption, front-to-rear air, 2x AC
Routing licenseLIC-FIX-5-FLXFull FLX, Fixed Group 5 — one per chassis
800G optic (duplex plant)QDD-800G-2FR4Dual CS connectors — stock CS patch cords
800G optic (parallel plant)QDD-800G-2XDR4Dual MPO-12
Step-down opticsQDD-400G-FR4 / QSFP-100G-FR2 km duplex SMF, LC
SupportA-Care tier per termQuote with hardware, same term across sites

RFQ & Availability

Quick Answer: Quote the chassis and license together, then the optics on the same delivery calendar. State route-table targets, encryption requirements, fiber types per span, and dated availability per quarter. At 800G the optics ecosystem is younger than the silicon, so lead-time risk concentrates in the QDD-800G lines.

BENQUAN GLOBAL LIMITED supplies DCS-7280R4K-32DE-F, configuration support, and worldwide shipping. Verify part numbers on SKU Lookup, then submit your routing brief on rfq.html.

Frequently Asked Questions

Quick Answer: Five questions dominate 7280R4K procurement: what the part number delivers, what the full FLX license adds over FLX-Lite, which 800G optics fit which fiber plant, when to choose it over 7060X5 fabric switches, and how to source it with dated availability. Answers below are standalone.

The official 7280R4 Series PDF is on Arista: 7280R4-Series-Datasheet.pdf. This page is the RFQ table — DCS-7280R4K-32DE-F 800G ports and LIC-FIX-5-FLX — so you size a deep-buffer router before opening that PDF. Confirm QDD-800G optics on the quote.

The Arista 7280R4 series fixed switch router with 32x 800GbE QSFP-DD ports, deep packet buffers, large route-table support, and enhanced encryption, running Arista EOS. It targets data-center interconnect, peering, and 800G spine-border roles rather than server-facing leaf duty.

The full FLX license for Arista Fixed Group 5: routing up to 3.5M routes, more than 24K ACLs, EVPN, VXLAN, Segment Routing, and advanced MPLS LER/LSR with traffic engineering plus link and node protection. One license per chassis; FLX-Lite tiers omit TE and protection.

QDD-800G-2FR4 (two 400G-FR4 channels, dual CS connectors, duplex single-mode, 2 km) and QDD-800G-2XDR4 (parallel single-mode, dual MPO-12, 2 km) at 800G, plus QDD-400G-FR4 and QSFP-100G-FR for step-down links. Match connector and fiber type per span before ordering.

Choose 7280R4K when you need deep buffers, internet-scale route tables, encryption, or WAN/DCI handoff. Choose DCS-7060DX5-64S-F class fabric switches for rail-optimized GPU leaf-spine at 1:1 subscription — different silicon philosophy, different price band.

Submit route-table and optics requirements through the RFQ desk for dated availability.

Key Takeaway

Key Takeaway: Order the DCS-7280R4K-32DE-F as four lines on one calendar: chassis, one LIC-FIX-5-FLX for 3.5M routes and traffic engineering, QDD-800G optics matched to the fiber plant — 2FR4 needs CS patch cords, 2XDR4 takes dual MPO-12 — and A-Care on a single term, since lead-time risk concentrates in 800G optics. BENQUAN GLOBAL LIMITED supplies the DCS-7280R4K-32DE-F with competitive pricing.

Speccing an 800G DCI or super-spine BOM?

If route-table sizing, FLX license tiers, or the 2FR4-versus-2XDR4 optics fork on your 7280R4 BOM are unconfirmed — or 800G optics lead times are quoted apart from the chassis — click below for a free compatibility and delivery risk assessment.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk

Contents