AI / Data Center Networking / 400G Switching / Specs / Ordering

Is the 7060DX5-64S 64 ports of 400G at 25.6 Tbps?

The 7060X5 64x400G QSFP-DD workhorse of 2026-2027 GPU buildouts — ports and silicon, airflow and power variants, FLX-Lite licensing, verified optics lines, and quote-ready ordering information.

Quick Take

Quick Take: DCS-7060DX5-64S-F is the Arista 7060X5 fixed switch: 64x 400GbE QSFP-DD, 25.6 Tbps Tomahawk 4 silicon, front-to-rear airflow, dual AC supplies. It anchors 400G leaf-spine fabrics for HGX AI clusters and general data centers, licensed with LIC-FIX-4-FLX-L Reference official datasheets for detailed specifications.

Key extractable numbers

DCS-7060DX5-64S-F on this page: 64× 400GbE QSFP-DD plus 2× SFP+, 25.6 Tbps on Tomahawk 4 class silicon, 113 MB shared packet buffer, sub-microsecond cut-through class, 2RU, front-to-rear airflow on the -F variant, dual hot-swap AC, license LIC-FIX-4-FLX-L (one per chassis). Lock airflow letter and QDD optics (OSFP does not fit); ports break out to 4×100G when needed.

Technical Specifications

Quick Answer: Headline numbers: 64x 400GbE QSFP-DD plus 2x SFP+, 25.6 Tbps switching capacity on Tomahawk 4 class silicon, 113 MB shared packet buffer, sub-microsecond cut-through latency class, 2RU chassis, front-to-rear airflow on the -F variant, dual hot-swap AC supplies, and EOS with FLX licensing tiers.

Two suffix letters sink more 7060X5 orders than any spec: the airflow letter (-F vs reversed) and the optics prefix (QDD- fits, OSFP- does not). Both are invisible on a spreadsheet BOM and both stall a data-hall install by weeks when wrong.
64x
400G QSFP-DD Ports
25.6T
Switching Capacity
2RU
Fixed Form Factor
1
License per Chassis
Specification DCS-7060DX5-64S-F
SeriesArista 7060X5 (fixed 400G data center)
Ports64x 400GbE QSFP-DD + 2x SFP+
Switching capacity25.6 Tbps, merchant silicon (Tomahawk 4 class)
Packet buffer113 MB shared
Latency classSub-microsecond cut-through
Form factor2RU fixed
AirflowFront-to-rear (-F suffix); reversed variant orderable
Power2x hot-swap AC supplies (DC options orderable)
Operating systemArista EOS (single image across the estate)
Routing licenseLIC-FIX-4-FLX-L — EVPN, VXLAN, SR, base MPLS LSR, 256K routes
Breakout4x 100G per QSFP-DD port
BOM-verified opticsQDD-400G-VSR4, AOC-D-D-400G-5M

Read the datasheet once, the suffix twice

Every number above matches vendor-published class specs; exact power draw varies by optics load and PSU option, so leave wattage to the site-survey line of the RFQ rather than a spreadsheet guess. The two things a datasheet will not save you from are ordering the wrong airflow letter and assuming OSFP modules fit — they do not.

Product Overview: Where the 64S Sits in the 7060X5 Family

Quick Answer: The 7060X5 series is Arista's 400G fixed-configuration data-center family. The 64S variant delivers 64 line-rate 400G QSFP-DD ports in two rack units, runs the same EOS image as the rest of the estate, and serves as both leaf and spine in two-tier fabrics up to thousands of GPUs.

The reason this exact part number dominates 2026-2027 GPU-cluster BOMs is economic as much as technical: one SKU covering both fabric tiers collapses EOS qualification, sparing, and RMA pools into a single line, and 64 ports at 400G is the sweet spot where a 512-node HGX scalable unit resolves to a clean 128-leaf / 64-spine build. The full sizing derivation lives in the Arista 7060X5 400G HGX fabric BOM.

7060X5 Front Panel, Ports & Chassis

Quick Answer: Every port takes QDD-400G-VSR4 for 50-meter OM4 runs to HGX nodes, AOC-D-D-400G-5M for in-row leaf-to-spine, or DR4-class single-mode beyond that. Ports also break out to 4x100G for storage and management edges, so a single platform covers compute, storage, and aggregation duties across the fabric.

Connectivity need Line item Limit to respect
Node-facing 400G (MMF)QDD-400G-VSR4 (switch end) + OSFP-400G-VSR4 (node NIC end)MPO-12 APC, parallel OM4, 50 m max
In-row leaf-to-spineAOC-D-D-400G-5MFixed 5 m, QSFP-DD both ends
Cross-row / long spansDR4-class 400G over single-modeDifferent fiber plant — not stretched OM4
Storage / management edge4x 100G breakout per portReserve leaf ports before full population

The form-factor split between the switch end and the node end is the most misordered detail on 400G BOMs — the full seat-by-seat guide is in OSFP-400G-VSR4 vs QDD-400G-VSR4.

Use Cases: Three Deployments, One SKU

Quick Answer: Three deployment patterns dominate: rail-optimized leaf and spine for HGX AI clusters at 1:1 subscription, classic EVPN-VXLAN leaf-spine for virtualized data centers, and dedicated storage or backend fabrics where deep buffers and line-rate 400G matter. The same chassis and license line covers all three.

1. HGX / GPU cluster back-end fabric

Leaf and spine of a rail-optimized two-tier fabric: 32 ports down / 32 up as leaf, all 64 ports leaf-facing as spine. A 512-node scalable unit consumes 192 chassis with matching VSR4 optics and AOC counts — quantities in the parent fabric BOM. RoCEv2 with PFC/ECN tuning carries NCCL traffic.

2. General data-center leaf-spine (EVPN-VXLAN)

LIC-FIX-4-FLX-L covers the full EVPN-VXLAN and Segment Routing stack for virtualization estates, with 400G spine capacity and 4x100G breakout density for server rows still on 100G NICs.

3. Storage / backend and aggregation fabrics

Deep shared buffer and line-rate 400G suit NVMe-oF and backup fabrics; the 2x SFP+ ports carry out-of-band management and telemetry without burning 400G ports.

Ordering Information (Part Numbers Only)

Quick Answer: Order the chassis, one LIC-FIX-4-FLX-L per switch, optics, and cables as separate lines. The -F suffix means front-to-rear airflow; a rear-to-front variant exists for reversed aisles, and DC power options are orderable. Part numbers below are quote-ready; no list prices are published here.

Order line Part number Notes
ChassisDCS-7060DX5-64S-F64x 400G QSFP-DD, front-to-rear air, 2x AC
Routing licenseLIC-FIX-4-FLX-LFLX-Lite, Fixed Group 4 — one per chassis
Switch-side opticQDD-400G-VSR4Node NIC end pairs with OSFP-400G-VSR4
Leaf-spine cableAOC-D-D-400G-5MIn-row runs only (5 m)
SupportA-Care tier per termQuote with hardware, same term across the fabric
  • Airflow discipline: do not mix -F and reversed-airflow chassis in one contained row
  • License timing: quote licenses with chassis — retrofitting 192 licenses after delivery delays turn-up
  • Spares: 2-3% optics spares per form factor, plus at least one cold-spare chassis per site

RFQ & Availability

Quick Answer: State role split (leaf vs spine), airflow direction, power feed type, license tier, and optics per port on one brief. Ask for dated availability per quarter — 400G switch and optics lead times diverge — and quote a peer platform on identical assumptions before freezing CapEx.

At 2026-2027 volumes the chassis is rarely the schedule risk; the optics lines are. Issue the switch and optics RFQ together on one delivery calendar, and pressure-test both against the 2026 optics shortage playbook before promising a cluster go-live date.

Verify part numbers on SKU Lookup, then submit your fabric brief on rfq.html.

Frequently Asked Questions

Quick Answer: Quick answers to the five things buyers check before ordering: what the part number means, what the -F suffix changes, which license and optics lines attach, and how to source it with realistic lead times. Every answer is standalone so procurement teams can paste it into an approval memo.

The official 7060X5 PDF is on Arista: 7060X5-Datasheet.pdf. This page is the RFQ table — DCS-7060DX5-64S-F ports and FLX-Lite — so you size a 400G leaf before opening that PDF. Confirm airflow suffix and optics on the quote.

Arista 7060X5 series fixed switch with 64x 400GbE QSFP-DD ports and 2x SFP+, 25.6 Tbps capacity, front-to-rear airflow, dual AC supplies, running Arista EOS. It is the standard leaf and spine platform for 400G HGX cluster fabrics and general data-center leaf-spine designs.

Airflow direction: -F is front-to-rear (port-side intake), matching cold-aisle-facing ports. A rear-to-front variant serves reversed rack orientations. Mixing airflow variants in one row causes thermal recirculation — confirm the suffix against your containment design before ordering.

For leaf-spine GPU fabrics, LIC-FIX-4-FLX-L (FLX-Lite, Fixed Group 4) covers EVPN, VXLAN, Segment Routing, base MPLS LSR, and 256K routes. One license per chassis. Full FLX tiers add features most GPU fabrics never use — do not over-license.

QDD-400G-VSR4 for 50 m OM4 multimode runs, AOC-D-D-400G-5M for in-row leaf-to-spine, DR4-class single-mode for longer spans, and 4x100G breakouts for storage or management edges. All ports are QSFP-DD; OSFP modules do not fit.

Submit your fabric sizing through the RFQ desk for dated availability.

Key Takeaway

Key Takeaway: DCS-7060DX5-64S-F is the workhorse 400G box of 2026-2027 GPU buildouts: 64x 400G QSFP-DD, one SKU for leaf and spine, FLX-Lite licensing, and a verified VSR4/AOC optics ecosystem. BENQUAN GLOBAL LIMITED supplies the Arista 7060DX5-64S with competitive pricing and worldwide shipping.

Speccing DCS-7060DX5-64S-F for a 2026-2027 buildout?

If airflow variants, license tiers, or optics pairings on your 7060X5 BOM are unconfirmed — or switch and optics lead times are quoted on different calendars — click below for a free compatibility and delivery risk assessment. Fast global BOM validation.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk