Quick Take
Quick Take: Identical faceplates hide different silicon. The 7050SX3-48YC8 cuts through at roughly 800 nanoseconds on 32 MB of shared buffer, while the 7280SR3-48YC8 trades latency for 4 GB of packet memory and deeper tables. Buffer depth and role, not the port map, decide which 1RU box your fabric actually needs.
Key extractable numbers
Same faceplate, different job on this page: DCS-7050SX3-48YC8 ≈ 800 ns cut-through on 32 MB shared buffer (low-latency leaf); DCS-7280SR3-48YC8 trades latency for 4 GB packet memory and deeper tables (edge/peering). Both: 48× SFP28 + 8× QSFP100 in 1RU. Lock role/buffer first, then -F/-R airflow and separate 25G/100G optics lines—do not swap platforms blindly.
7050SX3 & 7280SR3 Front Panel Spec Comparison
Quick Answer: Match on ports; diverge on throughput, latency, and buffer depth — those three decide leaf vs edge/peering roles. 2 (4) Tbps / ~4.0 Tbps wire-speed class Quad-core x86 / 8 GB (K variants add memory/SSD) Leaf / ToR / collapsed spine Do not swap blindly: Replacing a 7280R3 with a 7050X3 (or the reverse) because the faceplate matches.
Numbers below follow Arista 7050X3 and 7280R3 series datasheets. Confirm EOS feature license group, airflow (-F/-R), power, and optics against your design. BENQUAN GLOBAL LIMITED supplies Arista switches and optics. Related: Juniper QFX5120, Cisco Nexus 9300, Catalyst 9500. Use SKU Lookup (Arista) or request a quote.
| Item | 7050SX3-48YC8 | 7280SR3-48YC8 |
|---|---|---|
| Form factor | 1RU | 1RU |
| SFP ports | 48× 1/10/25GbE SFP28 | 48× 1/10/25GbE SFP28 |
| QSFP ports | 8× 40/100GbE QSFP100 | 8× 40/100GbE QSFP100 |
| Max 25/10G (w/ breakout) | Up to 64 | Up to 80 |
| Throughput (datasheet) | 2 (4) Tbps / ~4.0 Tbps wire-speed class | 2.0 (4.0) Tbps |
| Packets/second | ~1 Bpps | ~1 Bpps |
| Latency | ~800 ns (cut-through) | From ~3.8 µs |
| Packet buffer | 32 MB shared (dynamic allocation) | 4 GB deep buffer |
| Typical / max power | ~124 W / ~301 W | ~154 W / ~324 W |
| CPU / memory (base) | Quad-core x86 / 8 GB | Quad-core x86 / 8 GB (K variants add memory/SSD) |
| EOS license group | Per 7050X3 datasheet | Group 2 (7280R3 datasheet) |
| Primary role | Leaf / ToR / collapsed spine | Deep-buffer leaf, peering, interconnect |
Overview
Quick Answer: Same front-panel density does not mean the same ASIC job. 7050X3 is a low-latency, shared-buffer leaf platform. 7280R3 is a deep-buffer fixed switch-router for scale and burst absorption. Both DCS-7050SX3-48YC8 and DCS-7280SR3-48YC8 offer 48 SFP28 + 8 QSFP100 in 1RU.
Ordering Notes
Quick Answer: Arista part numbers carry the airflow direction, so order DCS-7050SX3-48YC8 or DCS-7280SR3-48YC8 with the -F or -R suffix that matches your aisle layout; the 7280 line adds K and MK builds carrying extra memory and SSD. Quote transceivers on separate BOM lines, verify AC versus DC supplies, and check the minimum EOS train.
| Platform | Example ordering SKUs |
|---|---|
| 7050SX3-48YC8 | DCS-7050SX3-48YC8-F / -R / # (configurable) |
| 7280SR3-48YC8 | DCS-7280SR3-48YC8 with -F/-R airflow variants; K/MK variants for more memory/SSD |
Optics are sold separately: SFP28 for server/storage access, QSFP28/QSFP+ for uplinks or breakout. Match EOS minimum version to the hardware train on the datasheet.
Use Cases
Quick Answer: Put the 7050SX3-48YC8 at top of rack where 25G server ports and sub-microsecond latency matter, and reserve the 7280SR3-48YC8 for aggregation or border roles where a 4 GB buffer absorbs peering, replication and media bursts. Both give 48 SFP28 plus 8 QSFP100 in one rack unit.
7050SX3-48YC8 — leaf / ToR
25G server attach with 100G uplinks, VXLAN leaf under EOS, LANZ visibility into shared-buffer congestion, CloudVision-managed fabric.
7280SR3-48YC8 — deep buffer / edge
Internet peering, DCI, storage or media bursts, designs that need multi-gigabyte buffers and richer scale-out L2/L3 resources.
Same rack, different roles
Common pattern: 7050X3 at ToR, 7280R3 at aggregation or border. Keep airflow consistent within the cold/hot aisle plan (-F vs -R).
Buying Checklist
Quick Answer: Decide the role and buffer depth before the part number, because that choice sets everything downstream. Then fix airflow direction to match the aisle plan, budget 25G and 100G optics or direct-attach cables separately, name the EOS feature license group and software train, and add spare power supplies with a support term.
- Role: leaf/ToR vs deep-buffer / peering / interconnect
- Model: 7050SX3-48YC8 vs 7280SR3-48YC8 (or K variant)
- Airflow: front-to-rear (-F) vs rear-to-front (-R)
- Optics / DACs / AOCs for 25G and 100G
- EOS feature licenses and minimum software train
- Spare PSU / fan tray and support term
Search Arista parts on SKU Lookup. For FC SAN leaf designs that sit beside Ethernet fabrics, see 32Gb FC switch buying guide.
Which Part Numbers Should You Freeze on the RFQ (1 SKUs)?
Quick Answer: When quoting DCS-7050SX3-48YC8-F and sibling configurations across these 1 part numbers, lock the exact base MPN, redundant power supplies, optics, and matching 1-year or 3-year support tier on separate lines before comparing vendor discounts. Channel net pricing remains industry estimate / pending confirmation.
| Ordering SKU | Key Configuration & Boundary | Adjacent BOM Lines to Freeze |
|---|---|---|
DCS-7050SX3-48YC8-F | 48x25G + 8x100G, 4 Tbps, 32 MB shared buffer, -F airflow. Optics, EOS license, and -R aisle plan as separate lines. | DCS-7050SX3-48YC8-R, SFP-25G / DAC per drawing, QSFP-100G per uplink, Feature group on the PO |
Frequently Asked Questions
Quick Answer: QSFP100 ports on both switches support breakout, though the exact lane modes depend on the optic and EOS release. Lower latency does not make the 7050X3 universally better: absorbing multi-millisecond congestion is the job of the 7280R3 buffer. License groups differ between the two families, so quote them with the chassis.
DCS-7050SX-64 and DCS-7050SX-72Q are prior 7050X 10/40G-class SKUs, not the 7050SX3 25G leaf. For a 2026 25G ToR RFQ use DCS-7050SX3-48YC8 (or 48YC12 where that EOS clock applies). Do not mix SX and SX3 on one BOM line.
Arista publishes 7050X3-Datasheet.pdf and 7280R3-Datasheet.pdf on arista.com. This page is the RFQ table — leaf versus deep-buffer spine ports — so you size EOS SKUs before opening those PDFs. Confirm breakout modes and EOS train on the quote.
Yes on both platforms — common modes include 100G, 40G, and multi-lane breakout (for example 4×25G / 4×10G / 2×50G depending on optic and EOS). Confirm the exact mode matrix in the model datasheet.
It offers higher wire-speed class and much lower latency for leaf traffic. It is not “faster” for absorbing multi-millisecond bursts — that is the 7280R3 4 GB buffer job.
Yes — feature license groups differ by platform family. Put Group / license SKUs on the RFQ with the chassis, not as an afterthought.
BENQUAN GLOBAL LIMITED supplies Arista 7050X3 and 7280R3 switches, optics, and support. Contact info@benquan.hk or request a quote.
Key Takeaway
Key Takeaway: Order the 7050SX3-48YC8 when the rack is 25G server attach with 100G uplinks and latency dominates; order the 7280SR3-48YC8 where peering or replication bursts must be absorbed. Fix airflow direction and EOS license group on the same purchase order. BENQUAN GLOBAL LIMITED supplies Arista DCS-7280SR3-48YC8 and DCS-7050SX3-48YC8 with competitive pricing.