Is the last order for the 7050SX3-48YC12 on 1 October 2026?

July 2026 advisories put a near-term leaf last-order date and a DRAM-specific campus carve-out on the calendar. Remap peers before hallway stock stories fail your PO.

Quick Take

Quick Take: Arista set October 1, 2026 last order for DCS-7050SX3-48YC12 and December 31 for select 4GB-DRAM CCS-720XP models. Other 720XP SKUs stay. Remap to the cited peers, dual-path Juniper/Extreme, and freeze optics Plan migration based on support lifecycle and budget cycles.

What the Two Deadlines Mean

Quick Answer: Arista published two separate clocks. October 1, 2026 is the last order date for the 7050SX3-48YC12 series, and December 31, 2026 is the last order date for selected 4GB DRAM CCS-720XP-48Y6 and 24Y6 units only. Software support continues for years after those dates, but new purchase orders cannot be placed.

Do not collapse “Arista EOS” into one date. 48YC12 leaf is October 1. Affected 720XP 4GB campus SKUs are December 31. Buying the wrong family against the wrong clock wastes a quarter of CapEx approvals.
Oct 1
48YC12 Last Order*
Dec 31
4GB 720XP Last Order*
4GB
720XP Carve-Out*
DRAM
Common Driver

*Dates and migration pointers summarize Arista July 2026 end-of-sale advisories for DCS-7050SX3-48YC12 and select CCS-720XP 4GB DRAM models. Confirm SKUs on the current advisory and your dated distributor quote.

Related: 7050X3 vs QFX5120 leaf · Arista memory lead-time pricing · Arista vs Juniper campus · Extreme DRPG window.

  • 48YC12 leaf — Last order Oct 1, 2026; bug-fix support cited through Oct 1, 2029 on the advisory wave.
  • 720XP 4GB only — Last order Dec 31, 2026; software support through Dec 31, 2029; EOL Dec 31, 2031 on the cited advisory. Other 720XP models unaffected.
  • Root cause pattern — Memory-configuration carve-outs and leaf SKU retirement both sit inside the same 2026 DRAM pressure story — see Arista memory lead-time guide.

Naming trap: “EOS”

In Arista campus marketing, EOS is also the network OS. In this article, EOS = end-of-sale. When you brief finance, say “last order date” — not “EOS OS upgrade.”

Who Gets Hit Hardest

Quick Answer: Three groups feel the Arista end-of-sale dates first: data center leaf estates standardized on the 7050SX3-48YC12 gold image, campus closets built from 4GB DRAM 720XP templates, and any project whose bill of materials assumed that any 7050X3 or any 720XP part number would stay orderable indefinitely. Audit which group describes your estate.

  • DC leaf gold images on 48YC12 — Nearest clock; start peer RFQ now, not late September.
  • Campus ATO with 4GB 720XP lines — Remap before Dec 31; do not rewrite every 720XP SKU blindly.
  • Optics-blind carts — Switch EOS without optics ATP still fails cutover — see optics shortage procurement.

Buyer Decision Matrix

Quick Answer: Place a last-buy order for the 7050SX3-48YC12 only when the supplier confirms an available-to-promise date before October 1, 2026. Remap new leaf demand to the cited Arista peer or dual-path a Juniper QFX quote. For campus, last-buy the affected 4GB 720XP variants or move to the 720XPM path, and leave unaffected 720XP models alone.

SituationHardware postureLicense / opsRFQ ask
Open 48YC12 PO ships before Oct 1Last-buy OKMatch EOS/support termWritten ATP + optics
New leaf after Oct 1Cannot order 48YC12CloudVision adjacency48YC8C check + QFX dual-path
4GB 720XP closet standardLast-buy or 720XPM pathEqualize PoE/mGigConfirm DRAM variant on PDF
Non-4GB 720XP already approvedLikely unaffectedDo not force remapSKU audit only
Ops / CapEx disputedThree-column shortlistYear-match supportJuniper + Extreme peers

Peer Maps & Procurement Traps

Quick Answer: Treat the advisory replacements as starting points rather than declared like-for-like swaps: DCS-7050SX3-48YC8C for the retiring leaf, and CCS-720XPM-48TH-6SY for the affected campus switches. Audit port counts and buffer behavior yourself, then dual-quote Juniper and Extreme peers on identical port, optic, and support assumptions before you accept any remap.

Affected patternCited Arista pathBuyer check
DCS-7050SX3-48YC12DCS-7050SX3-48YC8C (possible alt)Not declared like-for-like — port/optics audit
CCS-720XP-48Y6 / 24Y6 (4GB)CCS-720XPM-48TH-6SYConfirm DRAM size on every quote line
Other 720XP modelsUnaffected per advisoryDo not mass-replace

Three traps that break leaf/campus cutover

  1. Wrong 720XP — Rewriting non-4GB SKUs creates noise and delays real 48YC12 work.
  2. Peer without optics — QFX or Extreme wins on chassis then loses on 25G/100G optics lead time.
  3. Memory lead time ignored — Same DRAM crunch that drove EOS also stretches remaining Arista ATP — dual-path early.

For fair leaf peers, use the gold structure in 7050X3 vs QFX5120. Campus closets: Arista vs Juniper campus. Extreme buyers still inside DRPG: Extreme partner updates.

Actions Before October 1

Quick Answer: Split your inventory into data center leaf and campus access lists before anything else. Lock a dated available-to-promise commitment on remaining 7050SX3-48YC12 units or remap now, audit every 720XP line for its DRAM variant, dual-quote Juniper and Extreme peers, and freeze the matching optics on the same purchase order so cutover cannot stall.

  1. Split inventories — 48YC12 leaf vs 720XP campus; tag 4GB lines explicitly.
  2. Near clock first — 48YC12 last-buy or peer remap before Oct 1.
  3. Campus audit — Only 4GB 720XP-48Y6/24Y6 need Dec 31 action.
  4. Dual-path — Juniper QFX/EX and Extreme on equal port/optics briefs.
  5. Optics ATP — Same RFQ — do not orphan optics.
  6. Pre-PO validate — Power, airflow, licenses — pre-PO checklist.

RFQ Checklist — Arista EOS Windows

Quick Answer: State the role on the request for quotation, data center leaf or campus access, then list exact part numbers with the DRAM size printed for every 720XP line. Add your peer preference, the full optics map, any CloudVision requirement, and the go-live date. Demand a quote expiry and a dated available-to-promise commitment on each last-buy line.

What to put on the RFQ

  • Role: DC leaf (48YC12) and/or campus access (720XP)
  • Exact SKUs; for 720XP — DRAM size on the PDF
  • Preference: last-buy vs 48YC8C / 720XPM / dual-path OEM
  • Downlink / uplink counts; breakout needs
  • Optics SKUs and qty; stock vs ATP
  • CloudVision / support term years (match peers)
  • Alternate OEMs: Juniper QFX/EX and Extreme peer BOM
  • Lead time gates: Oct 1 leaf / Dec 31 4GB campus

Use SKU Lookup, then submit the dual-vendor brief on rfq.html.

Frequently Asked Questions

Quick Answer: The Arista 7050SX3-48YC12 last order date is October 1, 2026, and the affected 4GB 720XP switches stop at December 31, 2026. Not every 7050X3 or 720XP model is affected, so confirm per part number. Remap with honest port counts, dual-path a Juniper or Extreme peer, freeze optics on the same order, then request quotation.

No. The cited July 2026 advisory targets the DCS-7050SX3-48YC12 series. Do not assume the entire 7050X3 family shares that last-order date — confirm per SKU.

Risky. DRAM-driven lead times and optics ATP often clear before the printed last-order date. Dual-path now.

Often both on an open RFP. Use the leaf and campus comparison guides until TCO and ops close. Extreme may still offer DRPG price lock into November — verify registration status.

Send the port and optics brief via RFQ.

Key Takeaway

Key Takeaway: Arista buyers should run two calendars — October 1 for 48YC12 leaf and December 31 for 4GB 720XP campus. Win on SKU honesty, peer maps, and optics ATP. Lock optics and DAC lead times inside the same RFQ window. Confirm replacement SKUs on the RFQ.

Not sure your Arista leaf/campus BOM clears Oct 1?

If 48YC12 carts, 4GB 720XP variants, peer remaps, or optics ATP are unclear — click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment