Quick Take
Quick Take: The Arista single-mode optics ladder covers QSFP-100G-DR/FR at 100G, QDD-400G-DR4/FR4 at 400G, and QDD-800G-2FR4/2XDR4 at 800G. DR optics reach 500 meters, FR reaches 2 kilometers. Choose DR for intra-building links, FR for campus backbone. All models support 100G breakout over single-mode fiber, simplifying migration from 100G to 400G/800G infrastructure.
When to Use This Matrix
Quick Answer: Use this matrix when a BOM mixes 100G, 400G, and 800G ports across rooms and buildings on single-mode fiber. It decodes the DR, FR, DR4, FR4, 2FR4, and 2XDR4 suffixes, their reach and connectors, and which pairs interoperate. Multimode VSR4 optics live in the companion guide.
- Companion (multimode, in-room): OSFP-400G-VSR4 vs QDD-400G-VSR4 — 50 m OM4 links inside the GPU row
- Switch-side context: DCS-7060DX5-64S-F specs (400G fabric) and DCS-7280R4K-32DE-F specs (800G router)
- Lead-time context: Network switch & optics shortage 2026 — why optics gate the schedule
The Full SMF Matrix: Reach, Fiber, Connectors
Quick Answer: Reach and media decide everything: DR-class optics run 500 meters on parallel or duplex single-mode; FR-class optics run 2 kilometers. Connectors split three ways — LC duplex at 100G and 400G-FR4, MPO-12 for parallel DR4 and XDR4, dual CS uniquely on QDD-800G-2FR4.
| Part number | Standard | Reach | Fiber | Connector |
|---|---|---|---|---|
| QSFP-100G-DR | 100GBASE-DR | 500 m | Duplex SMF | LC |
| QSFP-100G-FR | 100GBASE-FR | 2 km | Duplex SMF | LC |
| QDD-400G-DR4 | 400GBASE-DR4 | 500 m | Parallel SMF (8 fibers) | MPO-12 |
| QDD-400G-FR4 | 400GBASE-FR4 | 2 km | Duplex SMF | LC |
| QDD-800G-2FR4 | 2x 400GBASE-FR4 | 2 km | Dual duplex SMF | Dual CS |
| QDD-800G-2XDR4 | 2x 400GBASE-XDR4 | 2 km | Parallel SMF | Dual MPO-12 |
How to read the suffixes
DR = 500 m reach class, PAM4 per-lambda; FR = 2 km reach class; a trailing 4 means four lanes (parallel or WDM); a leading 2 at 800G means two independent 400G channels in one module. Reach is a class ceiling, not a target — a 60 m hall-to-hall run on DR optics is normal and saves the FR premium.
Breakout & Interop Rules
Quick Answer: Same-standard ends always link: DR4 to DR4, FR4 to FR4. The workhorse combination is QDD-400G-DR4 breaking out to four QSFP-100G-DR over parallel single-mode, which is how 100G server rows uplink into 400G spines. Never mix DR with FR or single-mode with multimode on one span.
| A-end | B-end | Works? | Note |
|---|---|---|---|
| QDD-400G-DR4 | QDD-400G-DR4 | Yes | Point-to-point 400G, MPO-12 trunk, 500 m |
| QDD-400G-DR4 | 4x QSFP-100G-DR | Yes | MPO-12 to 4x LC breakout — the 100G-to-400G migration pattern |
| QDD-400G-FR4 | QDD-400G-FR4 | Yes | Duplex LC trunk, 2 km |
| QDD-800G-2FR4 | 2x QDD-400G-FR4 | Yes | Two independent 400G-FR4 channels via CS-to-LC cabling |
| QDD-400G-DR4 | QDD-400G-FR4 | No | Different standards — DR4 is parallel, FR4 is WDM duplex |
| Any DR/FR (SMF) | Any VSR4 (OM4) | No | Fiber types never mix — see the VSR4 multimode guide |
Why DR + DR4 dominates 100G-heavy estates
A 100G leaf estate uplinking into 400G spines wants one optic family with one reach class: QSFP-100G-DR at the leaf, QDD-400G-DR4 at the spine, MPO-12 breakout trunks between. One spare pool, one polarity plan, and every link stays inside the 500 m budget of a large hall.
The 800G Fork: 2FR4 vs 2XDR4
Quick Answer: QDD-800G-2FR4 behaves as two independent 400G-FR4 channels on dual CS connectors over duplex single-mode; QDD-800G-2XDR4 carries the same two channels on dual MPO-12 parallel fiber. Choose by fiber plant and patch-panel format, not price alone, and confirm CS-connector patch cords exist in your inventory.
- Duplex plant (LC/CS patch panels): QDD-800G-2FR4 — but audit patch-cord stock, because CS connectors are new to most sites
- Parallel plant (MPO trunks): QDD-800G-2XDR4 — reuses the same MPO-12 discipline as DR4 estates
- Typical seat: 800G router and super-spine ports — for example the DCS-7280R4K-32DE-F — splitting into two 400G links toward spine or peer devices
- Discipline: each 400G channel follows normal FR4/XDR4 interop rules; label both sub-channels on the patch panel from day one
RFQ Checklist for SMF Optics Lines
Quick Answer: Quote every transceiver as its own line with speed, reach suffix, and connector type, then attach a span table that proves each link fits DR at 500 m or FR at 2 km. Add 2 to 3 percent spares per optic type, and demand dated quarterly availability alongside the switch schedule.
What to put on the optics RFQ
- Per-line quantities: QSFP-100G-DR / QSFP-100G-FR / QDD-400G-DR4 / QDD-400G-FR4 / QDD-800G-2FR4 / QDD-800G-2XDR4
- Span table: longest run per link class, confirming DR (500 m) vs FR (2 km) assignment
- Fiber plant: duplex vs parallel trunks per span; MPO polarity plan for DR4/XDR4
- Connector inventory: LC, MPO-12, and CS patch cords per site
- Breakout lines: MPO-12-to-LC assemblies for DR4-to-4x100G-DR fans
- Spares: 2-3% per optic type per site, stated as separate lines
- Dated availability per quarter, on the same calendar as switch delivery
- Coding note: optics matched to Arista platforms on the same BOM
Verify part numbers on SKU Lookup, then submit per-line quantities on rfq.html.
Frequently Asked Questions
Quick Answer: Buyers ask five things about this ladder: the practical difference between DR and FR reach classes, whether 400G-DR4 really breaks out to four 100G-DR links, how the two 800G formats differ, whether single-mode and multimode ever mix, and how to source everything on one dated calendar.
Reach: QSFP-100G-DR runs up to 500 meters, QSFP-100G-FR up to 2 kilometers, both single-lambda 100G over duplex single-mode with LC connectors. Same speed, same fiber — pay the FR premium only on spans that actually exceed 500 meters.
Yes. 400GBASE-DR4 is four 100G PAM4 lanes on parallel single-mode, so one QDD-400G-DR4 fans out over an MPO-12-to-LC breakout into four QSFP-100G-DR links up to 500 meters. It is the standard 100G-leaf to 400G-spine uplink pattern.
Both carry two 400G channels up to 2 km. 2FR4 uses duplex single-mode with dual CS connectors; 2XDR4 uses parallel single-mode on dual MPO-12. Pick whichever matches your existing patch panels and trunk type; CS patch cords are the item most sites lack.
No. Both ends must match standard and fiber: DR/FR families run on single-mode, VSR4 runs on multimode OM4. For in-room 400G links under 50 meters, the multimode VSR4 pair is usually the cheaper answer — see the companion VSR4 guide.
Submit per-line quantities through the RFQ desk for dated availability.
Key Takeaway
Key Takeaway: One ladder, two questions per span: how far (DR 500 m vs FR 2 km) and which connector (LC, MPO-12, or CS). Get those right and 100G-to-800G migrations reuse one single-mode plant. BENQUAN GLOBAL LIMITED supplies Arista 100G, 400G and 800G single-mode optics with competitive pricing.