Quick Take
Quick Take: Airline liability for cargo under the Montreal Convention is capped at 26 SDR per kilogram, which can fall far short of an AI server’s value, so insure separately. Ask for all-risks cover (Institute Cargo Clauses A or equivalent) at the correct declared value, door to door, and check exclusions for packing, delay and inherent vice. Not insurance advice.
Not insurance advice. BENQUAN GLOBAL LIMITED is not an insurer or insurance broker. Confirm all wording, values and conditions with your own broker or insurer.
Why is airline liability not the same as insurance?
Quick Answer: The Montreal Convention caps carrier liability for cargo at 26 SDR per kilogram, effective 28 December 2024, up from 22. That limit follows weight, not invoice value, so a light, expensive server can be worth far more than the cap. Separate cargo insurance, or a declared value for carriage, is how value is addressed.
ICAO announced on 18 October 2024 that the cargo limit for destruction, loss, damage or delay rises from 22 to 26 SDRs per kilogram, with an indicative equivalent of about US$35 at the SDR rate on that date. Whether the limit applies to your shipment depends on the applicable law and the air waybill terms.
| Item | Symbolic example |
|---|---|
| Shipment gross weight | W kilograms |
| Carrier limit at 26 SDR per kg | 26 × W SDR |
| Shipment value | V, from the commercial invoice |
| Gap to address by cover or declared value | V minus the carrier limit, where V is larger |
No currency conversion is made here. Source: ICAO news release, 18 October 2024.
Who must insure the shipment under CIP, CIF or FCA?
Quick Answer: Under Incoterms 2020, the CIP seller must obtain cover complying with Institute Cargo Clauses (A) unless otherwise agreed, while under CIF the default minimum stays at Clauses (C). Under FCA, no insurance duty is placed on either party by the rule. State the insurer, level and value in the sales contract.
| Incoterm | Who insures | Minimum cover |
|---|---|---|
| CIP | Seller | Institute Cargo Clauses (A) by default; parties may agree lower |
| CIF | Seller | Institute Cargo Clauses (C) by default; parties may agree higher |
| FCA | No insurance duty under the rule | Buyer or seller should agree cover separately |
The ICC Digital Library notes that the move to Clauses (A) in CIP could also involve an additional premium cost. Source: ICC: differences between Incoterms 2010 and 2020. Check the Incoterms 2020 text itself for exact wording.
Which coverage points should you confirm with the insurer?
Quick Answer: Confirm all-risks wording, door-to-door duration, the valuation basis, handling of war and strikes cover, storage in transit, and how delay is treated. Under Institute Cargo Clauses (A), war and strikes are excluded and loss caused by delay is excluded. Ask the insurer what is added back and at what terms.
| Coverage point | What to ask | Red flag |
|---|---|---|
| All-risks basis | Is the wording Institute Cargo Clauses (A) or equivalent? | Named-perils wording for high-value electronics |
| Duration | Does cover run warehouse to warehouse, including transit storage? | Cover that stops at the port or airport |
| Valuation basis | How is the insured value set, and in which currency? | Basis left to the claim stage |
| War and strikes | Are they excluded, and is separate cover available? | Assuming they are included |
| Delay | Is loss from delay covered? | Expecting delay to be paid under all-risks |
| Special cargo | How are liquid-cooled racks treated? | No written answer |
Valuation uplifts, deductibles and premiums are policy-specific. This page quotes none; ask your broker or insurer.
Which standard exclusions matter most for AI hardware?
Quick Answer: Clause 4 of Institute Cargo Clauses (A) excludes wilful misconduct, ordinary leakage and wear, insufficient or unsuitable packing, inherent vice, delay, insolvency of vessel operators in set conditions, and nuclear weapons. For AI servers, packing, delay and inherent vice are the three most likely to decide a disputed claim.
| Clause | Plain English | Practical point for AI servers |
|---|---|---|
| 4.1 | Wilful misconduct of the assured | Honest declarations and handling records |
| 4.2 | Ordinary leakage, ordinary loss in weight or volume, ordinary wear and tear | Not an accident-type loss |
| 4.3 | Insufficient or unsuitable packing or preparation, where done by the assured or its employees or before the insurance attaches; packing includes stowage in a container; independent contractors are not employees | Keep pack-out photos and the packer’s details |
| 4.4 | Inherent vice or nature of the goods | Pre-existing fault is not a transit loss |
| 4.5 | Delay, even if caused by an insured risk | Lost schedule is not paid under this clause |
| 4.6 | Insolvency or financial default of vessel owners or operators, in set conditions | Ask whether the clause could affect your carrier mix |
| 4.7 | Nuclear weapons or devices | Rarely relevant to logistics planning |
Clauses 6 and 7 separately exclude war-related risks and strikes, riots and terrorism. Source: Institute Cargo Clauses (A) 1/1/09, as published by If.
Which documents should you keep for an AI server insurance claim?
Quick Answer: Keep the commercial invoice, packing list with serial numbers, air waybill or bill of lading, the insurance certificate or policy, pre-shipment photos, seal numbers, and the delivery receipt with any noted exceptions. Together they prove value, condition at dispatch, who carried the goods and what was found on arrival.
| Document | Who issues it | Purpose in a claim |
|---|---|---|
| Commercial invoice | Seller | Evidence of value and terms |
| Packing list with serial numbers | Seller or packer | Matches units claimed to units shipped |
| Air waybill or bill of lading | Carrier or forwarder | Contract of carriage and liability terms |
| Insurance certificate or policy | Insurer or broker | Proof and terms of cover |
| Pre-shipment photos and seal numbers | Shipper | Condition and packing at dispatch |
| Delivery receipt with exceptions noted | Consignee and carrier | Condition on arrival |
| Customs documents | Shipper and broker | Consistency of declared value and description |
Customs document detail is in the cross-border ICT customs compliance guide. Supplier-side checks before the order are in the pre-PO validation checklist.
What are the practical steps if cargo arrives damaged?
Quick Answer: Inspect on arrival, note every exception on the delivery receipt, photograph the damage and packaging, keep the damaged packaging, and notify the carrier and the insurer in writing promptly. Ask the insurer whether a survey is required before the goods are moved or repaired. Follow your policy wording for deadlines.
- Inspect on receipt and record exceptions on the delivery receipt before signing.
- Photograph the crate, seals, labels and the damaged unit.
- Keep damaged packaging and indicators such as tilt or shock labels.
- Notify the carrier and the insurer in writing, promptly, and keep proof of sending.
- Ask about a survey and do not repair or scrap units until the insurer agrees.
Typical scenario (illustrative, not a named customer): a buyer receives a crate with a tilt indicator tripped. Because the exception was noted on the delivery receipt and the pre-shipment photos and serial-number packing list were kept, the claim file shows condition at dispatch and at arrival.
Time limits and procedures are set by the policy wording, the contract of carriage and applicable law; confirm them with your insurer.
How do liquid-cooled racks and split shipments affect cover?
Quick Answer: Ask the insurer in writing how it treats liquid-cooled racks, coolant leakage and packing responsibility, because no public wording is cited here. For mixed or partial shipments, insure each leg and each consignment at its own value and keep documents matched to each leg so a claim can be traced.
Rack-scale logistics are covered in the Vera Rubin NVL72 shipping guide, and air booking planning in the Q4 air freight checklist. For multi-line RFQ orders that ship in parts, name each consignment, its value and its Incoterm on the order. Reprice-until-shipment risk on supplier quotes is discussed in the HPE reprice-until-shipment guide.
Frequently Asked Questions
Usually not. The Montreal Convention caps cargo liability at 26 SDR per kilogram, a weight-based figure that does not follow invoice value. High-value servers normally need separate cargo insurance or a declared value for carriage. This is not insurance advice.
Institute Cargo Clauses (A) exclude, among others, wilful misconduct, ordinary leakage and wear, unsuitable packing in set conditions, inherent vice, delay, and certain insolvency and nuclear risks, plus war and strikes under clauses 6 and 7. Read the full wording with your insurer.
Under Incoterms 2020 the seller must obtain cover under CIP (Clauses A by default) and under CIF (Clauses C by default). FCA places no insurance duty on either party under the rule. Write the cover level, value and insurer into the sales contract.
Institute Cargo Clauses (A) exclude war in clause 6 and strikes, riots and terrorism in clause 7. If you need that protection, ask your insurer whether separate cover is available and on what terms. Terms are policy-specific and not quoted here.
Keep the commercial invoice, packing list with serial numbers, air waybill or bill of lading, insurance certificate, pre-shipment photos and seal numbers, and the delivery receipt with exceptions noted. These support value, condition at dispatch and carriage.
Institute Cargo Clauses (A) exclude loss, damage or expense caused by delay, even if the delay is caused by an insured risk, except general average expenses. Ask your insurer if any separate delay cover exists. Schedule risk is better managed through routing and booking.
Ask the insurer. This page cites no public wording on coolant leakage, electronic-device clauses or liquid-cooled racks, and makes no claim. Provide the vendor pack-out, coolant ship-state and handling spec with your request. This is not insurance advice.
ICAO states the cargo limit is 26 SDR per kilogram from 28 December 2024, up from 22. Whether it applies to a given shipment depends on the applicable law and the air waybill terms, including any declared value for carriage.
References
Quick Answer: The facts on this page come from three primary documents: an ICAO news release, the Institute Cargo Clauses (A) 2009 text published by If, and the ICC Digital Library note on Incoterms 2020. Each link was opened and checked on 2026-10-15. Wording and limits can change, so confirm current terms with your insurer.
- ICAO: international air travel liability limits set to increase — Cargo limit 26 SDR per kg from 28 Dec 2024, previously 22; indicative US$35 at the 18 Oct 2024 rate. Checked 2026-10-15.
- Institute Cargo Clauses (A) 1/1/09 (If) — Clause 1 all risks; clause 4 exclusions; clauses 6 and 7 war and strikes. Checked 2026-10-15.
- ICC Digital Library: Incoterms 2010 versus 2020 — CIP minimum Clauses (A); CIF minimum Clauses (C). Checked 2026-10-15.
- The Loadstar: AI shippers still looking for capacity — Record US air freight imports with GPUs and servers among drivers (14 Oct 2026). Checked 2026-10-15.
Key Takeaway
Key Takeaway: Do not rely on carrier liability for high-value AI servers: agree who insures, ask for all-risks cover at the correct declared value, and keep the claim documents. Not insurance advice. BENQUAN GLOBAL LIMITED supplies AI servers sourced through authorized channels, with pricing an industry estimate, to be confirmed.