Storage Networking / Fibre Channel SAN / Buying Guide

Is the 32Gb fabric a 48-port or a 64-port switch?

Compare Dell DS-7720B, Cisco MDS 9148T/9250i, and Brocade G720 — ports, chassis bandwidth, NVMe-oF, and which fabric fits your SAN.

Quick Take

Quick Take: Every switch on this shortlist auto-negotiates 8/16/32Gb and carries FC-NVMe, so the purchase turns on four other variables: chassis throughput between 1.5 and 3.2 Tbps, a 48 or 64 port ceiling, Fabric OS against SAN-OS, and whether IP extension ships in the box or as separate hardware.

Key extractable numbers

32Gb FC shortlist on this page (all auto 8/16/32 + FC-NVMe): Dell DS-7720B — 48 ports max (24-port base), 2.5 Tbps, Fabric OS; Cisco MDS 9148T — 48 ports, 1.5 Tbps, SAN-OS/NX-OS SAN, FCIP path on 9250i; Brocade G720 — up to 64 ports (24/48/64), 3.2 Tbps, Fabric OS 9.2. Decide on chassis bandwidth, port ceiling, OS gravity, and whether IP extension is in-box or separate hardware—quote dual fabric A/B.

Side-by-Side Comparison

Quick Answer: Same speed class; differences are chassis bandwidth, max ports, OS (Fabric OS vs SAN-OS), and whether FCIP is built in. 48 (24-port base, upgrade to 48) No (dedicated FC; extension HW separate) 32Gb auto-negotiate NVMe-oF over FC 1U form factor Dual fabric required.

All three platforms auto-negotiate 8/16/32Gb, support FC-NVMe, and belong in dual-fabric designs. Pair switch choice with your array generation — for entry hybrid flash see MSA 2060 / MSA 2062. Use SKU Lookup or request a quote.

FeatureDell DS-7720BCisco MDS 9148TBrocade G720
Max ports48 (24-port base, upgrade to 48)4864 (24/48/64 configs)
Port speed32Gb (auto 8/16/32)32Gb (auto 8/16/32)32Gb (auto 8/16/32)
Chassis bandwidth2.5 Tbps1.5 Tbps3.2 Tbps
NVMe-oF over FCYes (FC-NVMe)Yes (FC-NVMe)Yes (FC-NVMe)
OSFabric OS (Brocade-based)Cisco SAN-OS / NX-OS SANFabric OS 9.2
VSAN / Virtual FabricsVirtual FabricsVSAN + IVRVirtual Fabrics
Smart ZoningYes (Brocade)Yes (Cisco)Yes (Brocade)
EncryptionAES-256 (license)AES-256 (built-in path)AES-256 (license)
IP extensionNo (dedicated FC)Yes (FCIP on 9250i)No (dedicated FC; extension HW separate)
ManagementDell OpenManage, BNACisco DCNM / NDFC, CLIBrocade SANnav, CLI
Form factor1U1U1U
Support modelDell ProSupportCisco SNTC / Smart NetBrocade / OEM partner

32Gb auto-negotiate NVMe-oF over FC 1U form factor Dual fabric required

Dell DS-7720B

Quick Answer: Dell rebadges Brocade hardware here: 24 to 48 ports of 32Gb Fibre Channel, 2.5 Tbps of chassis bandwidth, and stock Fabric OS that joins existing Brocade fabrics. Its real argument is one ProSupport contract covering array and fabric together. The cost is an OEM premium, a 48-port ceiling, and no native FCIP.

Dell OEM Brocade — 24–48 ports, 2.5 Tbps

The DS-7720B runs standard Fabric OS and interoperates with Brocade-based fabrics. Dell ProSupport can cover storage plus switching in one stack for Dell shops.

Best for: PowerStore, PowerMax, or Unity environments that want single-vendor support.

Trade-offs: No built-in FCIP; capped at 48 ports; OEM premium vs equivalent generic Brocade SKUs.

Cisco MDS 9148T / 9250i

Quick Answer: The MDS 9148T delivers 48 ports of 32Gb Fibre Channel under SAN-OS, and the 9250i folds FCIP into the switch itself so IP-based distance replication needs no add-on blade. Pick this pair when a multi-vendor or UCS-heavy fabric wants VSAN isolation and Ansible-driven automation, accepting trickier licensing and less bandwidth headroom than the G720.

Cisco SAN-OS — 48 ports, FCIP on 9250i

Differentiators: VSANs, IVR, TrustSec-style fabric security options, and NX-API / Ansible automation. Strong fit next to Cisco UCS.

Best for: Multi-vendor SANs, FCIP extension, UCS-centric ops, encryption without a separate license path on many packages.

Trade-offs: License packaging is more complex; learning curve vs Fabric OS; lower chassis bandwidth than G720 at scale.

Brocade G720

Quick Answer: The G720 is the Gen 7 bandwidth leader in this shortlist at 3.2 Tbps, and the only option that scales to 64 ports in a single switch. FC-NVMe tuning and fabric analytics come with Fabric OS. Extension for distance replication needs separate hardware, and support stays fabric-only rather than end-to-end.

Gen 7 Fabric OS — 24–64 ports, 3.2 Tbps

Industry-standard Fabric OS with analytics and FC-NVMe optimization. Largest installed-base expertise pool among pure FC vendors.

Best for: Max line-rate all-flash, scaling past 48 ports per switch, Brocade-native fabrics.

Trade-offs: No built-in FCIP (needs extension hardware); less “one stack” coverage than Dell/Cisco OEM stories.

Decision Framework

Quick Answer: All three run at 32Gb, so faceplate speed decides nothing. Dell storage estates that want a single support contract land on the DS-7720B; fabrics needing native FCIP, VSANs or IVR land on Cisco MDS; and builds pushing past 48 ports or wanting peak bandwidth land on the Brocade G720.

  • Choose DS-7720B if: You run Dell storage and want one support contract; ≤48 ports; Brocade Fabric OS with Dell coverage.
  • Choose Cisco MDS if: You need FCIP without extra hardware; VSANs/IVR; UCS-aligned ops; multi-vendor fabric.
  • Choose Brocade G720 if: You need 3.2 Tbps class bandwidth; >48 ports; greenfield performance SAN.

Port Sizing Guide

Quick Answer: Formula: storage ports + host ports + ISL + 25% spare. Always deploy dual fabrics (A and B). Small (2 arrays + 4 hosts) Medium (4 arrays + 8 hosts) Large (8 arrays + 16 hosts) Each fabric is an independent switch or pair.

Deployment Storage ports Host ports ISL ports Recommended
Small (2 arrays + 4 hosts)88224-port
Medium (4 arrays + 8 hosts)1616448-port
Large (8 arrays + 16 hosts)3232448-port dual fabric

Each fabric is an independent switch or pair. Add spare ports for growth and RMA swing space.

Frequently Asked Questions

Quick Answer: Port sizing follows a formula rather than a model preference: storage ports plus host ports plus inter-switch links, then 25 percent spare capacity. That usually lands mid-size fabrics on 48 ports each. Mixing 16Gb HBAs works because links auto-negotiate downward, and every switch here supports NVMe over Fibre Channel.

Dell DS-7720B (24–48 ports, Dell ecosystem), Cisco MDS 9148T (48 ports, security/VSAN), Brocade G720 (24–64 ports, highest bandwidth). All support NVMe-oF over FC.

DS-7720B is Brocade-based and Dell-supported — best for Dell-only shops. Cisco MDS runs SAN-OS with VSANs, FCIP (9250i), and advanced security — best for multi-vendor fabrics.

Mid-size (4 storage + 8 hosts): typically 48 ports per fabric. Small (2 + 4): 24 ports. Formula: storage + host + ISL + 25% spare.

Yes — auto-negotiation works. Each link runs at the lowest speed of both ends. Upgrade HBAs for full 32Gb.

Contact info@benquan.hk or request a quote.

Key Takeaway

Key Takeaway: Decide on the constraint that binds first. Under 48 ports with Dell arrays, a single ProSupport contract makes the DS-7720B cheapest to run; SAN extension over IP forces the 9250i; growth past 48 ports leaves only the G720. Lock serials and optics before PO.

Not sure your BOM is optimal?

If you are unsure whether your BOM is optimal, click below for a free compatibility and delivery risk assessment. Fast global BOM validation and risk assessment.

Free Compatibility & Delivery Risk Assessment