Quick Take: DCS-7050CX4M-48D8 is the 100G QSFP leaf in this Arista 7000 fabric; 24D12 is the port code on DCS-7280CR3AK-24D12, a 7280R3 mixed 400G/100G spine. The reference build totals 208 switches for 100G/400G spine-leaf. Confirm -F/-R airflow and licenses on a dated RFQ. Fit for data-center fabric sizing; unfit as a campus access BOM.

This is a reference spine-leaf build on Arista DCS-7000 switches — spine and leaf models, optical BOM, and aggregate fabric specs for a 208-switch deployment. Part numbers and quantities are a starting configuration; confirm the oversubscription ratio and optics count against your port map. Related: Arista vs NVIDIA Spectrum leaf, request a quote.

Solution Overview

Quick Answer: This Arista data-center fabric delivers scalable performance for cloud, virtualization, and AI workloads on the DCS-7000 series. It provides high-density 100G and 400G connectivity with sub-microsecond latency and CloudVision automation and telemetry, built as a spine-leaf design that scales to thousands of endpoints.

Key benefits:

  • Scalable spine-leaf architecture supporting thousands of endpoints
  • 100G/400G Ethernet for maximum throughput
  • Sub-microsecond latency for real-time applications
  • CloudVision automation and telemetry platform
  • 3-year service coverage with 6-7 month delivery

Network Architecture Components

Quick Answer: The fabric uses two spine tiers and two leaf tiers. DCS-7260CX3 (96 units) provides 100G spine density; DCS-7060DX5 (16 units) adds a 400G core for AI/ML interconnect. Leaf switches split between 25G server access (7050SX3) and high-density 100G for storage and GPU clusters (7050CX4M).

LayerSwitchQtyRoleHighlights
SpineDCS-7260CX3-64-F96High-density 100G spine64x 100GbE QSFP28, 6.4 Tbps, deep buffers, advanced routing and EVPN
SpineDCS-7280CR3AK-24D12-FRFQMixed 400G/100G 7280R3 spine24D12 port code: confirm QSFP-DD vs QSFP28 split, FLX license, and -F/-R airflow
SpineDCS-7060DX5-32-F16400G core spine32x 400GbE QSFP-DD, 12.8 Tbps, ideal for AI/ML cluster interconnect
LeafDCS-7050SX3-48YC8-F48Hybrid 25G/100G leaf48x 25GbE SFP28 + 8x 100GbE QSFP28 uplinks, low-latency cut-through
LeafDCS-7050CX4M-48D8-F48High-density 100G leaf48x 100GbE QSFP28, 4.8 Tbps, MACsec, for storage and GPU clusters — not 7050SDX4-48D8

DCS-7050CX4M-48D8 Front Panel, Ports & Chassis

Quick Answer: DCS-7050CX4M-48D8 presents 48x 100GbE QSFP28 server-facing ports plus 400G-class uplinks in the 48D8 code. Airflow is -F (front-to-rear) or -R (rear-to-front). It is a QSFP leaf, not DCS-7050SDX4-48D8 (SFP-DD). 24D12 is not a 7050 faceplate — it is DCS-7280CR3AK-24D12, the mixed 400G/100G 7280R3 spine SKU.

Definition: On an Arista 7000 leaf-spine RFQ, DCS-7050CX4M-48D8 is the high-density 100G QSFP ToR used for storage and GPU-cluster attach. DCS-7280CR3AK-24D12 is a 7280R3 spine whose 24D12 suffix encodes a mixed 400G/100G port map — size the QSFP-DD versus QSFP28 split against your uplink plan, then add FLX licensing and matched optics. Do not copy the 208-switch quantity table as a frozen PO; re-derive counts from oversubscription.

  • Leaf SKU: DCS-7050CX4M-48D8-F or -R — 48x 100GbE QSFP28, MACsec, 4.8 Tbps class.
  • Spine SKU: DCS-7280CR3AK-24D12-F or -R — confirm 24D12 port split and FLX license on CPQ.
  • Collision: 7050CX4M-48D8 ≠ 7050SDX4-48D8; 24D12 ≠ a 7050 leaf nickname.

Optical Connectivity

Quick Answer: Interconnect uses 100GBASE-DR QSFP28 for spine-leaf single-mode links (11,136 modules), 100G QSFP28 DAC for short in-rack runs (480), and 400GBASE-DR4 QSFP-DD for the 400G spine core (896). Match optics quantities to your actual port map and cable-reach plan before ordering.

ComponentSpecificationQtyApplication
QSFP-100G-DR100GBASE-DR QSFP28, 500m SMF11,136Spine-leaf interconnect
CAB-Q-Q-100G-3M100G QSFP28 DAC, 3 meters480Short-distance connections
QDD-400G-DR4400GBASE-DR4 QSFP-DD, 500m SMF896400G spine interconnect

Technical Specifications

Quick Answer: The reference build totals 208 switches delivering 2,304x 25GbE plus 4,608x 100GbE server-facing ports at sub-microsecond latency, with a 3-year service term and a 6-7 month delivery timeline. Treat these as aggregate figures and re-derive port counts from your final spine-leaf ratio.

ParameterSpecification
Total switch count208 units
Server connectivity2,304x 25GbE + 4,608x 100GbE ports
Latency<1 microsecond
Service period3 years
Delivery timeline6-7 months

Use Cases

Quick Answer: The fabric suits four roles: AI/ML infrastructure needing high-bandwidth GPU-cluster interconnect on the 400G core, cloud data centers needing multi-tenant spine-leaf scale with EVPN segmentation, storage networks needing ultra-low latency for all-flash and NVMe-oF, and virtualization estates needing high-density VMware or OpenStack server connectivity at 25G and 100G.

Use caseHow the Arista fabric fits
AI/ML infrastructureHigh-bandwidth connectivity for GPU clusters and distributed training on the 400G core
Cloud data centersScalable spine-leaf for multi-tenant environments with EVPN segmentation
Storage networksUltra-low latency for all-flash arrays and NVMe-oF
VirtualizationHigh-density connectivity for VMware and OpenStack estates

How to RFQ this Arista 7000 fabric

Quick Answer: Freeze endpoint count and 100G/400G split, pick DCS-7050CX4M-48D8 versus 7050SX3 for the leaf, pick DCS-7280CR3AK-24D12 versus 7260CX3/7060DX5 for the spine, then equalize optics and support years on one dated RFQ. Do not mix SX and SX3, or CX4M and SDX4, on the same line.

  1. Step 1 — Freeze the port map. Write 25G vs 100G server attach, 400G core need, and oversubscription before any chassis SKU is chosen.
  2. Step 2 — Lock leaf SKUs. DCS-7050CX4M-48D8 for 100G QSFP leaves; DCS-7050SX3-48YC8 for 25G; never mix with 7050SX-64 or 7050SDX4-48D8 on the same line.
  3. Step 3 — Lock spine SKUs. DCS-7280CR3AK-24D12 when you need mixed 400G/100G 7280R3; DCS-7260CX3-64 or DCS-7060DX5-32 when the table role matches.
  4. Step 4 — Equalize optics and term. Match QSFP-100G-DR / QDD-400G-DR4 counts, -F/-R airflow, FLX licenses, and support years, then RFQ.

Key Takeaway: This DCS-7000 spine-leaf fabric scales 100G access and a 400G core into a 208-switch reference build with sub-microsecond latency and CloudVision automation for cloud, storage, and AI workloads. Confirm the spine-leaf oversubscription ratio and optics count against your port map before freezing the BOM. BENQUAN GLOBAL LIMITED supplies the Arista fabric with competitive pricing and configuration support.

Frequently Asked Questions

What is DCS-7050CX4M-48D8?

DCS-7050CX4M-48D8 is an Arista 7050X4-class 100G QSFP leaf used in 7000 fabrics: 48x 100GbE QSFP28 plus 400G-class uplinks in the 48D8 port code, with MACsec on the high-density 100G leaf role. It is not DCS-7050SDX4-48D8 (SFP-DD). Confirm -F vs -R airflow on the quote.

What is 24D12 or DCS-7280CR3AK-24D12?

24D12 is the port-code suffix on DCS-7280CR3AK-24D12, a 7280R3 mixed 400G/100G spine SKU paired with DCS-7050CX4M leaves in Arista 7000 fabrics. Confirm the 400G QSFP-DD versus 100G QSFP28 split, FLX license, and airflow suffix on the dated CPQ.

Sizing an Arista spine-leaf fabric?

Send your endpoint count, oversubscription target, and 100G/400G split for a free compatibility and delivery risk assessment. BENQUAN validates switch and optics quantities.

Free Compatibility & Delivery Risk Assessment

Or call +852-21349834 · info@benquan.hk