Which Entry Point Fits Your Deployment
Quick Answer: Pick the tier by binding constraint, not ambition. Inference of models up to 70B parameters fits one 8-GPU node. Production serving with concurrency and failover needs a two-to-four node pod on a 400G fabric. Fine-tuning or pre-training beyond 70B requires a non-blocking InfiniBand cluster with parallel flash storage.
| Tier | Fits | Interconnect | Indicative budget (July 2026) |
|---|---|---|---|
| Single node | 70B-class inference, pilots, RAG stacks | In-rack 100/200G Ethernet | $300K–$350K (8-GPU B300 DGX-class baseline) |
| Inference pod | Production serving, concurrency, failover | 400G Ethernet or InfiniBand leaf | From ≈$700K for two nodes, plus 15–25% fabric and storage |
| Training cluster | Fine-tuning and pre-training at scale | Non-blocking InfiniBand NDR | ≈$4.2M per 128 H100-class GPUs; Blackwell per allocation |
The tiers share one design language, so a node grows into a pod and a pod into a cluster without discarding fabric or storage decisions. Resolve exact part numbers in SKU Lookup, and see the AI compute hub for the platform families behind each tier.
Tier 1 — Single GPU Node for 70B-Class Inference
Quick Answer: One 8-GPU B300 DGX-class node carried a July 2026 baseline of $300,000 to $350,000, with reseller configurations quoting past $400,000. A leaner two-GPU H200 NVL PCIe build serves 70B-class models where rack power is tight; that configuration is quoted firm on RFQ because PCIe pricing shifts weekly.
| Component | Specification | Notes |
|---|---|---|
| GPU platform | 8× B300 SXM (DGX/HGX-class) or 2× H200 NVL PCIe | SXM for headroom; PCIe where power and budget are tight |
| Host config | Dual-socket CPU, 1–2 TB DDR5, dual NVMe boot | Per platform vendor — Supermicro, Dell, HPE, Lenovo, ASUS |
| Local storage | NVMe U.2/E1.S for model weights and KV cache | Size to model set plus 30% headroom |
| Network | 2× 100/200G uplinks to existing leaf | No dedicated fabric needed at one node |
| Power / cooling | N+1 PSUs; confirm rack density and DLC readiness | Blackwell-class SXM nodes assume liquid-cooling planning |
Sizing rule from our cluster sizing guide: fit the largest model in GPU memory first — a 70B model at FP16 needs roughly 140 GB — then add compute for concurrency. The single-node tier exists because most first deployments are inference, and inference is memory-bound, not FLOPS-bound.
Tier 2 — Production Inference Pod (2–4 Nodes)
Quick Answer: A production pod runs two to four GPU nodes behind a 400G leaf, with shared NVMe flash for models and KV cache. Applying the published node baseline twice, a two-node pod starts near $700,000 before fabric, storage and power distribution, which typically adds another 15 to 25 percent.
| Component | Specification | Notes |
|---|---|---|
| GPU nodes | 2–4× 8-GPU systems, one platform family | Mixed generations complicate schedulers — avoid |
| Fabric | 400G Ethernet (RoCEv2) or InfiniBand leaf | Ethernet is usually sufficient for inference-only pods |
| Optics & cables | QSFP-DD / OSFP transceivers, DAC in-rack | Budget per port, not per switch — see fabric guides |
| Shared storage | All-flash NVMe tier for models, cache, logs | Pure, NetApp, PowerStore or Dorado class |
| Head / service node | 1–2U dual-socket server | Scheduling, monitoring, gateway duty |
| Power | Intelligent PDUs, N+1 feeds per rack | Confirm per-rack kW budget before ordering |
The pod is where fabric choice gets decided — our InfiniBand vs Ethernet analysis covers when RoCEv2 holds and when it does not. For the switch shortlist itself, start from the Arista vs NVIDIA Spectrum leaf comparison.
Tier 3 — Fine-Tuning and Training Cluster (16+ Nodes)
Quick Answer: Training clusters are sized in 8-GPU HGX increments on a non-blocking InfiniBand NDR spine with parallel flash for checkpoints. Our published mid-2026 reference puts 128 H100-class GPUs near $4.2 million capex; Blackwell-generation fleets price strictly per allocation, so quote validity windows matter as much as the number.
| Component | Specification | Notes |
|---|---|---|
| Compute | 16+ nodes, 8-GPU HGX class (H200 / B300) | Allocation-bound — sequence orders early |
| Spine | InfiniBand NDR, non-blocking fat-tree | ConnectX-7/8 NICs, rail-optimized topology |
| Storage | Parallel flash, multi-GB/s sustained | Dataset staging plus checkpoint bursts |
| Cooling | Direct liquid cooling — CDUs, manifolds, RDHx | Plan with the DLC BOM checklist |
| Power | High-density PDUs, UPS, N+1 feeds | Validate with the power budget checklist |
At this tier the non-GPU engineering dominates risk: fabric topology, checkpoint bandwidth and liquid cooling determine whether the cluster trains at the utilization you budgeted. Our utilization tuning guide shows where delivered clusters lose their first 20 percent.
The BOM Beyond GPUs: Fabric, Storage, Cooling, Power
Quick Answer: GPUs draw the headlines while fabric, storage, cooling and power decide whether the system ships complete. Budget optics and cabling per port, not per switch; size flash for dataset staging plus checkpoint bursts; and confirm rack power density and liquid cooling before the GPU order, because retrofits stall deployments for months.
The four line-item groups buyers forget most often:
- Optics and cables — transceivers routinely add five figures per rack at 400G; count ports on both ends. See the 100G–800G optics guide.
- Storage bandwidth — checkpoint writes are burst loads; an array sized on capacity alone will throttle training. See FlashBlade for GPU storage.
- Cooling hardware — CDUs, manifolds and rear-door heat exchangers carry their own lead times. See the liquid-cooling BOM checklist.
- Power distribution — intelligent PDUs and UPS capacity per rack; validate against the AI server power budget checklist.
Budget Reality: What the Anchors Mean and What Moves
Quick Answer: Anchor figures here are published market baselines, not quotations: roughly $53,000 street for a single B300 accelerator, $300,000 to $350,000 for an integrated 8-GPU system, and about $4.2 million for a 128-GPU H100-class cluster. Allocation, currency and logistics move final numbers, so firm pricing carries a validity window.
Two patterns in those numbers deserve a sentence each. First, integrated 8-GPU systems at allocation can price below eight times the single-card street figure — single accelerators trade at a spot premium, so per-card math overstates system budgets. Second, previous-generation platforms (H100/H200 class) hold a meaningful discount to Blackwell while remaining fully supported, which is why our H200 vs B200 procurement guide treats generation choice as a budget lever, not a spec-sheet contest. For the full market context behind these anchors, see the B300 price guide.
From Architecture to Firm Quote
Quick Answer: Send the workload profile rather than a guessed part list: model family and size, training or inference split, target concurrency or tokens per second, facility power and cooling limits, and destination country. We return a complete bill of materials with firm pricing and delivered lead time within one business day.
What to include in the RFQ
- Workload: training, fine-tuning, inference, or mixed — with model families and sizes
- Throughput target: tokens per second, concurrent sessions, or training deadline
- Tier under consideration: single node, pod, or cluster — or ask us to recommend
- Facility limits: per-rack kW, cooling type available, floor space, rack depth
- Existing infrastructure to reuse: switches, storage arrays, PDUs
- Destination country and any import or certification constraints
- Budget window and required delivery date
Frequently Asked Questions
Quick Answer: These architectures are starting points that get tailored to models, facility and budget on RFQ. The most common adjustments are GPU generation substitution when allocation slips, fabric downshift from InfiniBand to 400G RoCEv2 for inference-only pods, and storage resizing once real dataset and checkpoint volumes are known.
No. They are validated starting points. Every deployment is re-sized to the model list, facility limits and destination, then quoted as a complete bill of materials with firm line items.
GPU pricing is allocation-driven and moves weekly. The figures cited are July 2026 published baselines; a firm quotation carries its own validity window and delivered lead time.
Yes, if the fabric and storage are designed for it upfront. A 400G leaf with spare ports and a flash tier sized for expansion lets a single node become a pod without forklift changes.
Yes. Fabric switches, optics and cables, storage, PDUs and cooling hardware go on the same bill of materials, which is exactly where missing line items usually stall a deployment.
Send your workload profile or part list through the RFQ form.
Key Takeaway: Choose the smallest tier that satisfies the binding constraint: memory for inference, interconnect for training. Lock facility power and cooling before committing to Blackwell-class nodes, and treat every GPU price as allocation-dated. BENQUAN GLOBAL LIMITED supplies complete node, pod and cluster BOMs with competitive pricing and worldwide shipping.